French officials have given the nod to a 3.8km long extension north to Paris’ Metro Line 12. The bored line with three stations will cost US$261.3M and should open in 2007.

Serving the tunnelling industry since 1969.
French officials have given the nod to a 3.8km long extension north to Paris’ Metro Line 12. The bored line with three stations will cost US$261.3M and should open in 2007.