Russia’s railways minister was due to decide, as we go to press, whether to build a $2.5bn tunnel or bridge as part of a railway between the mainland and Sakhalin Island.

Serving the tunnelling industry since 1969.
Russia’s railways minister was due to decide, as we go to press, whether to build a $2.5bn tunnel or bridge as part of a railway between the mainland and Sakhalin Island.