The driver broke late reacting to a traffic jam, causing his truck to lose stability and topple, spilling the flammable cargo on the road surface, before a spark from the truck ignited the fluid.
According to local media, the tunnel was closed for approximately six hours.
The tunnel cameras caught the incident, and footage is available on YouTube: https://www.youtube.com/watch?v=klzVYVTAavQ