The World Road Association (PIARC) has published a report entitled Fire and Smoke Control in Road Tunnels. The report is available In English and French and includes sections on: objectives of fire and smoke control; ventilation for fire and smoke control; and fire response manage-ment and tunnel resistance to fire. Contact: the Publications Department. Tel: +31 1 47968121 Fax +33 1 490 00202.
