In Vietnam, the prime minister has approved an extra US$7.7M to a project to repair four railway tunnels through the Hai Van Pass. The tunnels are part of the US$251 Hai Van Pass tunnel project due to trial operations this May.
Serving the tunnelling industry since 1969.
In Vietnam, the prime minister has approved an extra US$7.7M to a project to repair four railway tunnels through the Hai Van Pass. The tunnels are part of the US$251 Hai Van Pass tunnel project due to trial operations this May.