At 10ft (3m) long, the replica is 1/35th the size of the machine that will arrive from Japan next year. The real machine will be 300ft (91.4m), 57ft (17.3m) in diameter and weigh 6,700t.

Serving the tunnelling industry since 1969.
At 10ft (3m) long, the replica is 1/35th the size of the machine that will arrive from Japan next year. The real machine will be 300ft (91.4m), 57ft (17.3m) in diameter and weigh 6,700t.