A panel of 17 judges, led by ITA president Tarcisio Celestino, evaluated and chose finalists to move onto the second evaluation stage, which will be held at the 13-16 November conference in Paris. (Full disclosure: each year the panel of judges includes a rotating member of the tunnelling media and editor of Tunnels & Tunnelling International Alex Conacher is this year’s representative.)
MAJOR PROJECT OF THE YEAR (over EUR 500M)
- Confederation LRT line – Canada
- Delhi Metro Phase 3 expansion of networks – India
- Qatar Rail Metro – Qatar
- Tehran Metro Line 6 – Iran
PROJECT OF THE YEAR (between EUR 50M and EUR 500M)
- Blue Plains Tunnel – US
- Citybanan, B4-9523 Norrströmstunnel – Sweden
- MTR Shatin to Central Link (SCL) Contract 1103 Hin Keng to Diamond Hill Tunnels – Hong Kong
- Túnel Emisor Poniente (TEP) II – Mexico
PROJECT OF THE YEAR (up to EUR 50M)
- Fjærland hydropowerplants – Norway
- Southwark to City of London deep cable tunnel – UK
- Tunnel Kennedy – Chile
- TECHNICAL PROJECT INNOVATION OF THE YEAR
- Construction of bifurcation section of underground expressway underneath residential area, application of enlargement/widening technology of TBM tunnel, first challenge in the world wide tunnelling industry – Japan
- Implementing BIM concepts to Karavanke tunnel – Slovenia
- Trenchless construction of pedestrian underpass using a rectangular box jack TBM at Thomson-East Coast Line Havelock Station – Singapore
TECHNICAL PRODUCT/EQUIPMENT INNOVATION OF THE YEAR
- Automatic drilling jumbo – Finland
- RowaTrain – Self-driving trackless supply logistic system – Austria
- Strength monitoring using thermal imaging (SMUTI) – UK
SUSTAINABILITY INITIATIVE OF THE YEAR
- Anacostia River Tunnel in Washington D.C. – US
- ITO Metro Station – India
SAFETY INITIATIVE OF THE YEAR
- BSCU SCL radial joint design – UK
- MineARC’s Guardian remote Monitoring and diagnostics for refuge chambers – Australia
- Telemach Cutterhead disc robotic changing system – Hong Kong
INNOVATIVE UNDERGROUND SPACE CONCEPT OF THE YEAR
- Bostanci Intermodal Hub – Turkey
- Cavern Master Plan of Hong Kong – Unlock hidden land resources for sustainable city development – Hong Kong
- Underground cemetery in tunnels – Israel
YOUNG TUNNELLER OF THE YEAR
- Anthony Bauer – US
- Juan David Herrera – Colombia
- Michele Janutolo Barlet – France
- Roberto Schuerch – Switzerland
- Tobias Andersson – Norway
