Siemens A/S is a multinational company headquartered in Denmark, that engineers, and supplies Sinorix® high-pressure water mist systems for fire protection of buildings, industrial applications, and tunnels worldwide.
We provide a complete fixed fire protection system for tunnels, whether it is road, rail, metro, or sub-sea infrastructures. Our full-scale tests with fire load up to 250 MW are in accordance with SOLIT2 and NFPA502, certified by accredited independent 3rd party laboratory.
With low water consumption and excellent performance, Sinorix® is the system of choice to provide protection for structure and life safety and prevent/minimize tunnel operation interruption.
