Alwag
Tel: +43 7229 610490
Fax: +43 7229 70141
Email: office@alwag.com
Web: www.alwag.com
Alwag offers a complete programme of products for mining and tunnelling. The AT casing tube system sets a new standard in drilling and anchorage technology, drastically scaling back costs and time required.
Alwag’s tunnel arches protect against fractures and facilitate the well-adjusted production of the excavation cross section. The normal anchorage is affected mainly between the tunnel arches.
Extreme locations require the construction of anchoring walls and avalanche protection units. For tunnel construction Alwag offers IBO- and IBI-anchors, selfdrilling anchors, reinforcement anchors, full bar anchors and friction bolts. References include: Tunnel Brixlegg West, Austria; Lainzer Tunnel, Austria; Westtangententunnel, Germany; Chienbergtunnel, Switzerland; M5 East Motor Highway, Sydney; Lots 230, 240, 260, Taiwan.
Atlas Copco Craelius
Tel: +46 858 77 8500
Fax: +46 859 11 8782
Email: craelius@atlascopco.com
Web: www.atlascopco.com/craelius
Atlas Copco Craelius has developed a wide range of ground engineering plant and equipment used in many situations including underground construction. The organisation has a particular expertise in grouting for ground consolidation, preventing groundwater passage, cavity filling and sealing rock anchors.
Grouting systems consist of a mixer, agitator, grout pump, grout injection recorder and hole packers. Craelius’ Unigrout is a complete grouting plant (skid- or truck-mounted if required), which includes all the necessary equipment. All systems are driven by the proven PUG hydraulic power units and controlled from a central panel. Individually, the Cemix mixer produces a uniform mix without lumps or aggregations. The Cemag agitator provides a counter-current to keep the mix in suspension whilst releasing air bubbles. Streamlined grout channels are self-cleaning for easy servicing.
Ground engineering drilling equipment includes Mustang multi-purpose rigs in three models of various configurations including DTH, rotary, and top-hammer drifter drilling methods. Atlas Copco COP series hydraulic drills are available for grout holes of 35-76 mm diameter (models COP 1032 to COP 1800). Mustangs can be used for grouting, jet grouting and anchoring and are available in four models with torques from 5000Nm to 13,000Nm and lifting capacities from 4t to 9t.
Atlas Copco Rock Drills
Tel: +46 19 670 7000
Fax: +46 19 670 7070
Email: rde@atlascopco.com
Web: www.rockreinforcement.com
A comprehensive range of rock bolts and drill rigs is available from Atlas Copco Rock Drills. In addition to the rock-bolting capabilities of the Atlas Copco Boomer drill jumbos, the specialist range of Boltec rock-bolting rigs with the HBU bolting unit are amongst the most versatile on the market. The three models can be used with all commonly used rock bolts including Swellex, mechanically anchored bolts, resin- or cement-grouted bolts and Split Set bolts.
Atlas Copco now offers an enlarged range of complete rock-bolting systems for Swellex and mechanical bolts. The unique Swellex design, with pressurised water expansion, has been extended with the Manganese Line offering improved breaking loads from 120kN-240kN in hole diameters of 32mm-52mm, plus increased elongation before breaking. Standard Swellex, with a breaking load of 10kN, is still available for hole diameters of 32mm-39mm. An extendable version, the Swellex Mn2E, has three or more connectable sections for longer holes and use in confined spaces.
The MAI range of self-drilling anchors (SDA) is a recent addition to the Atlas Copco portfolio. These anchors are available with outer diameters of 25mm- 76mm and lengths of 1-6m. They are suited to loose or collapsing ground and feature a hollow core for flushing or simultaneous grouting and drilling.
Bekaert Building Products
Tel: +44 1142 224 4487
Fax: +44 1142 224 4564
Email: John.greenhalgh@bekaert.com
Web: www.bekaert.com/building
NV Bekaert are the manufacturers and suppliers of the original Dramix steel wire fibres for reinforcement for concrete used in underground construction.
The first UK steel fibre segmental lining was used at the Heathrow Baggage tunnel in 1994 and from that point Dramix has been used in several pre-cast linings around the UK. In projects overseas the first use was in 1989 in Eastern Sicily. Dramix is currently being used in running tunnels at CTRL 220/240/103 and is soon to reinforce the extensions into the new Terminal 5 complex at Heathrow.
Dramix has been used for many years around the world in deep mining and civil tunnels as well as repairs and refurbishment of old tunnels. The hooked end provides excellent anchorage in the concrete matrix and this provides high performance in toughness.
Bekaert have now also developed a new high carbon Dramix fibre that provides high levels of ductile behaviour or toughness in high strength concrete. The Dramix still has the classic shape and features, but now has a tensile strength of over 2400MPa thus providing excellent performance in the sprayed concrete currently being placed at T5 and soon to be used at the Kings Cross redevelopment project in Central London.
Bernold-Ceresola
Tel: +41 58 455 5000
Fax: +41 58 455 5001
Email: info@bernold-ceresola.com
Web: www.bernold-ceresola.com
Bernold-Ceresola produces a wide range of lining solutions including tunnel formwork, segment manufacturing plants, carousel lines, segment design, moulds, reinforcement cages, segment handling equipment and steel supports. The tunnel formwork range includes: vault shutters; invert shutters; soffit/suspended slab shutters; niche and cross passage shutters; full-round shutters; reinforcement, profiling and membrane gantries.
Pre-cast segment production installations, from initial design through to works commissioning, are designed to take local conditions such as wage rates, quality of raw materials and climate into consideration. The company both designs and manufactures segment moulds of all sizes. The equipment required for checking and adjusting mould tolerances is included in the initial supply.
For industrial scale mass production Bernold-Ceresola produces fully automated carousel installations, characterised by their simplicity of operation, low maintenance requirements and availability. Bernold-Ceresola also designs and supplies equipment for de-moulding, lifting, turning, rotating and moving of segments of all weights and sizes.
Bochumer Eisenhütte Heintzmann
Tel: +49 234 911 8222
Fax: +49 234 911 8228
Email: info@be-heico.de
Founded in 1851, BEH is one of the best-known suppliers of tunnel and roadway support in the world. With its subsidiary company in the US and several agencies throughout the world, the Heintzmann-group is ready to attend any project.
Amongst the products in the range are: solutions for yielding and rigid support in tunnels and mines; lattice girders; TH-profiles; star-profiles; corresponding connection systems; Heintzmann props; construction solutions for large-capacity excavations; self drilling injection bolts; threadbar bolts, cable bolts, etc.
Heintzmann Security deliver complete controlled access systems for plants and public buildings designed, manufactured and maintained in accordance with the local circumstances and the special requirements of customers.
CBE-Tunnels
Tel: +33 2 4737 5364
Fax: +33 2 4737 5318
Email: cbe.export@wanadoo.fr
Web: www.cbe-tunnels.com
CBE-Tunnels has 25 years of experience in the design and manufacture of steel moulds, the realisation of plants and industrial equipment for the production of concrete segments used for bored tunnel linings.
CBE-Tunnels has supplied many clients with more than 6600 segment moulds and 160 manufacturing plants to date. The CBE processes guarantee accuracy and quality of the related works. CBE-Tunnels provides the experience and know-how for the implementation of this type of industrial product, which requires the use of the leading technology for calculation, machining and manufacturing, in accordance with the quality system and 3D checking system.
CBE’s position is best demonstrated by its international presence, on-site manufacture of the segments for Arrowhead (US), Bologna (Italy), Barcelona, Abdalajis (Spain) and Krasnoyarsk (Russia) has just begun. Now the SMART project in Kuala Lumpur (Malaysia), handled by Wayss & Freytag and MMCEG-Gamuda JV, and the Shiraz and Esfahan Metro projects (Iran) are under realisation in CBE-Tunnel’s workshops.
ChemGrout
Tel: +1 708 354 7112
Fax: +1 708 354 3881
Email: wally@chemgrout.com
Web: www.chemgrout.com
Specially designed tanks and mixing pumps make ChemGrout colloidal mixing both efficient and profitable. Water and solid materials are drawn through the high-speed diffuser type pump, rotating at speeds of up to 2,000rpm, to prevent flocculation and achieve complete particle wetness. Mixing time is significantly reduced by the high shear action of the colloidal mixing pump, aided by a unique powered bridge breaker device that enhances pump flow rates. This high shearing action has shown to increase apparent fluidity of slurry mixes by 20% over paddle mixers, an important advantage for dam, rock and soil grouting where the ability to penetrate tight formations is necessary.
The CG-600 Series is a heavy duty, high volume colloidal grout plant favoured for heavy construction projects. This unit features a high speed-mixing pump that thoroughly wets each particle and discharges the mixed material into a 13 cubic foot capacity agitating holding tank. A direct-coupled progressing cavity pump delivers slurries at a rate of up to 20gpm and pressures of up to 261psi. Power options are air, hydraulic, electric/hydraulic or diesel/hydraulic.
Colcrete Eurodrill
Tel: +44 1246 868700
Fax: +44 1246 868701
Email: info@colcrete-eurodrill.co.uk
Web: www.colcrete-eurodrill.com
Colcrete Eurodrill is a world leader in the design and manufacture of mixing and pumping equipment and innovative drilling systems. The time tested and site proven design provides significant advantages for the preparation of cement based grouts and bentonite slurries as used in the tunnelling; geotechnical; drilling; nuclear; civil engineering and mining industries worldwide.
The new Colcrete Crusader unit has been developed to mix various materials such as mortars, plasters, self leveling screeds, textured coatings etc. As part of the initial design specification, Colcrete will be offering an add-on attachment, a small colloidal mixer capable of mixing two bags of cement slurry. This will enable users to pre-mix small batches of colloidally mixed cement slurry prior to mixing it with filler materials in the paddle-mixing tank. In doing so the end user will be able to achieve higher strength grouts quicker than before with similar equipment. All usual attachments provided with this type of equipment will be available.
Dätwyler
Tel: +41 41 875 1395
Fax: +41 41 875 1546
Email: rubber.constr@daetwyler.ch
Web: www.daetwyler.ch
Dätwyler specialises in the design and production of rubber and plastic profiles. The company’s compression gaskets have sliding surfaces for better behaviour of the keystone and soft corners to avoid spalling whilst its hydro-expansive gaskets offer immediate water-tightness, increased volume, and increased contact pressure by expansion of the seal. Datwyler’s co-extruded gaskets offer increased water tightness using a hydro-expansive top layer. Apart from immediate water tightness, there are additional safety issues if gaps open between segments water pressures, a hard body profile with soft, hydro-expansive top and lips is available.
Modular requirements include: additional safety for specific zones using DaetSwell profiles; provision of hydro swelling surfaces for delayed gap opening; protection against aggressive soil or water, using profile protection surfaces; low friction on the keystone, using sliding surfaces; and Dätwyler standard EPDM profiles for watertightness.
Specialised technology uses a co-extruded profile for: additional safety in the event of tunnel deformation; risk reduction; long term protection against aggressive groundwater; individual project solutions; and additional advantages at low cost.
Doka Formwork Technology
Tel: +43 7472 605 2505
Email: heinrich.ecker@doka.com
Web: www.doka.com
Depending on the situation on-site, travelling a forming carriage on heavy-duty rollers may require time-consuming lining and levelling adjustments. Repositioning the carriage by means of flanged wheels running on rails is equally laborious, as these rails (or travelling profiles) have to be re-laid for every new section. In Austria’s Kirchham by-pass project, this was why the forming carriage being used for a cut and cover tunnel was fitted with the first-ever Doka hydraulic crawler drives. These drives, each with 5t of motive power, are suitable for highly varied transportation tasks on hard, flat surfaces such as a previously cast base slab. The crawler drives can move high loads of up to 20t each, much more gently than transport rollers.
Made of Doka SL-1 system components, the forming carriage being used on the Kirchham cut and cover tunnel site advances at a speed of approx. 1km/h. Integral turntables make it easy to correct the direction of travel. Two of the four crawler units have a hydraulic drive. They are operated by just one man, via a hydraulic unit. The diagonal arrangement of the driven crawler units ensures that the forming carriage can also be moved sideways if the on-site situation requires it.
Elasto-Plastic Concrete
Tel + 44 1590 671199
Fax: + 44 1590 671155
Email: aridout@elastoplastic.com
Web: www.elastoplastic.com
Barchip reinforcing fibre is a structural synthetic fibre for shotcrete and concrete. Barchip fibre is suitable for use: as shotcrete reinforcement for permanent works and repair work; in precast concrete such as tunnel segments; and in ready mix concrete.
Launched earlier this year Barchip Kyodo is the latest in the range of structural fibres from EPC. Barchip Kyodo offers even greater toughness per kg whilst maintaining all the benefits of the original Barchip fibre that has seen widespread use in North America, Australasia, Japan and Europe. Barchip’s unique engineered design incorporates an embossed texture and surface coating that enhances mixability.
The embossing gives the fibre exactly the right amount of concrete/fibre bond so as to resist pullout but also prevent the fibre from snapping, ensuring equivalent post crack performance to steel fibre. Other advantages include: no rusting; no risk of puncture injury – common with contact with steel fibres; alleviates the problem of ‘short circuiting’ electrical trailing cables; enhances the shotcrete’s fire resistance; and less weight for handling when dosing fibres.
Elkem Materials
Tel: +47 38 01 75 00
Fax: +47 38 01 49 70
Web: www.multigrout.elkem.com
Elkem offers a practical solution to many water control problems in underground construction; the MultiGrout System for injection grouting has a proven track record of success over a wide range of conditions in many countries. Recent developments in cementitious materials technology combined with the five years of practical and skillful application of the system in real underground projects has resulted in a very flexible and competent injection grouting system.
Combining the use of base Portland cements, whether ordinary cement or selected microfine and ultrafine cements depending on outcomes required, GroutAid penetrating and stabilising additive and special Blocker set-controlled cement, MultiGrout can tackle the most severe or demanding water inflow problems, or simply the most routine grouting programme, in the most efficient way.
The time costs of grouting are the major cost for any grouting programme. So efficient grouting means achieving the results you need in the shortest possible time. Careful selection of grouting design, materials and procedures are all part of the MultiGrout team skills.
The application of MultiGrout, has resulted in unprecedented groundwater control and grouting efficiency as well as ground strengthening, potentially reducing rock reinforcement and support requirements through rock mass improvement.
Euro Panels Overseas
Tel: +32 15 71 82 80
Fax: +32 15 71 82 89
Email: info@europanelsoverseas.be
Web: www.europanelsoverseas.be
Euro Panels Overseas, a member of ETEX Group in Belgium, supplies panels and systems for secondary tunnel linings of road tunnels. The GLASAL panel has been used extensively in many tunnel projects all over the world for more than 30 years. GLASAL can be used in both circular and rectangular cross sections. A variety of fixing systems are available, and tailor made systems can be developed, based on the company’s vast experience in this field.
Due to its totally non-corrosive substrate, GLASAL panels have a unique position within the different solutions available on the market. The panel comes in a standard colour range, but special colours can be offered if requested. This makes it possible to use colour patterns in the tunnel to contribute to the comfort and safety of the users.
