The Charles Machine Works, manufacturer of Ditch Witch underground construction equipment, has recently added three systems to work in the pipe replacement market. The new Ditch Witch PR50, PR75, and PR95 pipe bursting systems are designed to fracture or cut most types of existing pipe – water, sewer, or utility – and pull in new pipe with 50, 75, or 95t of pullback force, respectively.
Advantages of these new pipe bursting systems are said to include outstanding durability, simplicity of operation, productivity and the ability to easily and efficiently cut or fracture most types of pipe such as clay, PVC, steel, ductile iron and cast-iron pipe.
Other standard features include quiet, fully enclosed power packs and load-sensing hydraulics that automatically shift the unit to high speed when there’s no load, and downshift the unit when a load is introduced to increase machine productivity.
Ditch Witch
Tel: +1 800 654 6481
Web: www.ditchwitch.com
The Ditch Witch PR95 pipe bursting system
