With a track record stretching back eighty years, Ferrovial-Agromán is one of the world’s leading construction companies. Operating across fifty countries in five continents, we specialize in the delivery of major construction and civil engineering projects and have an exceptional reputation for technical innovation and cost-effectiveness.
London
Attractive salary plus pension
You will be responsible for;
- Measuring the ground (including aspects such as small and large scale distances, angles, elevations
- Gathering data on the earth’s physical and man made properties
- Processing data
- Undertaking digital mapping
- Analyzing information thoroughly before it is handed over to other professional areas
- Thinking creatively to resolve practical planning and development problems
- Interpreting data using maps, charts and plans
- Utilizing data from a range of resources, such as aerial photography and laser beam measuring systems
- Be a link between design, monitoring and construction
- Using CAD and other IT software to interpret data and present information
- keeping up to date with new and emerging technologies
- Contribute to the achievement of Health and Safety in accordance with company policy
The successful candidate will have:
- Degree level in Land Surveying or Surveying and Mapping Sciences
- Previous experience as a surveyor in a tunnel environment
- Good knowledge of Health and Safety Legislation
- Ability to perform assignments independently with supervision and guidance required only for overall objectives, critical issues and new concepts
- Good verbal communication skills
- Good knowledge of laser beams, theodolite and CAD
- The ability to work with initiative when outside influences affect planned operations
- Commercial and Contractual awareness
- Good knowledge of microsoft systems
- CSCS card
To apply please send your CV with a covering letter detailing your experience for this position and stating your current salary to hr@ferrovial.es
