Quick-coupled, steel pipe systems that are unbeatable in the tough environment of tunnel construction. Transporting media from point A to B needs to be reliable, easy and cost-efficient. Alvenius piping systems are easy-to-install, flexible, and light weight, Our system is the environmentally sound solution which can easily be recycled for several projects.
Personnel
President – Johan Leiker;
Vice President – Magnus Andersson;
Sales Manager – Carl Aleblad
