Core Control Solutions Ltd. (CCSL) are a systems integration house specialising in road tunnel system delivery, upgrade and maintenance.
Our core business is the integration of road tunnel systems such as heat/fire detection, pollution monitoring, lighting, ventilation, PAVA, signage, telephony and fire suppression systems using advanced networking and PLC/SCADA systems.
We provide turnkey projects delivering all systems detailed above integrated into a single holistic user interface aimed at reducing operator workload and providing a clear and concise operational view of the tunnel systems during incidents.
Our system support team currently maintains tunnel technology systems on 19 UK road tunnels with engineers based at our head office in Derbyshire and a remote office in London allowing a 4 hour call out to all current UK tunnel locations.
