Since over 25 years, Transport & Logistics division of DBA provides its services, specifically in the sector of technological equipment serving transport infrastructures. Reflecting the Group’s innovative philosophy, the Transport&Logistics division has combined the experience gained over time in designing electrical, mechanical and special equipment, as well as data networks in roads and motorways infrastructures. DBA has also developed significant experience by acquiring specific know-how on issues of tunnel safety and critical underground infrastructures. In the last few years DBA was involved in many design concerning traffic control systems, safety algorithms and procedure, smart roads networks, control centres and backbone infrastructures.
Personnel
CEO: Raffaele De Bettin;
Transport&Logistic Division Manager: Nicolò Faggioni
