Design, Engineer, Supply, Inspect, Repair of Underground Construction/ expansion/ seismic joints. Including but not limited to Conceptual Design, Shop Drawings, Material supply, Onsite Training, Visual inspections, Material Testing, General Advise, Monitoring Systems, BIM services.
General Monitoring Systems for on-site collaboration between all stakeholders.
Personnel
Frank Blok
