IPI Packers manufacture inflatable packers and related equipment for high-pressure grouting, permeability testing, hydraulic fracturing and a wide range of other applications. For TBM and drill&blast tunnelling, the grout-free expandable standpipes and drill-through temporary standpipes provide quick, simple and secure solutions for drill collar control in areas where high pressure and high flow groundwater is encountered. Alongside a wide range of standard products, IPI Packers excel at developing customized solutions to meet customers’ exact needs and expectations.
Personnel
Joel Adams – Director Mine-Water-Geotech
