Major tunnelling contractor throughout Australia across all sectors (transport, water, wastewater, energy and renewable energy). All methods for underground construction including TBMs (large diameter and metro sized, EPB, slurry, double shield and gripper types), roadheader, drill & blast, pipejacking, cut & cover, shaft constructions and heavy civil structures.
Personnel
General Manager Tunnelling – David Hake
