Civil Engineering; Design/Engineering for Tunnels; Construction Method Engineering; Tunnel Geotechnics; TBM Tunnelling; Mining; Microtunnelling; HDD; Shafts; Temporary Works; Sprayed Concrete Linings (SCL/NATM); Pre-Cast Linings; Ground & Groundwater Control; Expert Witness; Engineering Management; Surveys, Inspection & Assessment; Tunnel Asset Management; Tunnel Refurbishment
Personnel
Consultancy Director – Darren Page;
Managing Director – Susan Greene;
Chairman – Jon Austin
