Padley & Venables have been manufacturing in the UK for over 100 years.
P&V’s range of Rock Drilling products include tunnelling/drifting and extension drilling equipment; Shank adaptors, Couplings, Drill Rods, TC Tipped Drill Bits and Reaming equipment, Integral Drill Steels, Taper Rods and Bits, together with the latest Tube Drilling systems.
P&V also manufacture a wide range of high quality Demolition Tools for use with most types of Boom Mounted Hydraulic Breakers, in addition to the manufacture of Contractors’ Tools for use with Pneumatic and Electric Hammers.
Quality Tools, Made in Britain, Proven Worldwide.
Personnel
General Manager – Steve Harper
