Use the Roxtec sealing system as standard solution when designing and outfitting tunnels and bridges. It is a proven and area efficient way of protecting electrical equipment from fire, flooding, gas, dust, and electromagnetic interference. Install Roxtec cable and pipe seals in technical rooms, substations, and control cabinets as well as in pits and bypasses to avoid frost damage and pests.
The sealing solutions are ideal for handling anything from high cable density to cable retention in underground applications. They are appreciated among design engineers for being flexible and available as BIM objects, and among installation firms for providing built-in spare capacity for future upgrades.
Roxtec GmbH
Success
You have successfully submitted your enquiry. Someone from our company will respond ASAP
Use the Roxtec sealing system as standard solution when designing and outfitting tunnels and bridges. It is a proven and area efficient way of protecting electrical equipment from fire, flooding, gas, dust, and electromagnetic interference. Install Roxtec cable and pipe seals in technical rooms, substations, and control cabinets as well as in pits and bypasses to avoid frost damage and pests.
Address
Roxtec GmbH
Neuer Höltigbaum
1-3, 22143
Hamburg/Germany
Email address
Links
