Brokk, a developer of remote-controlled demolition robots, has launched Brokk Smart Attachments, a range of patented innovations designed for the Brokk SmartPower+ robots.
Brokk SmartPower+ is a new generation of robots that was launched in January 2024. The range includes Brokk 170+ and Brokk 200+.
The range of new attachments includes the BROKK CUT-OFF SAW and the BROKK TE DRILL.
The attachments are designed to boost performance, ease of use, and productivity for operators, said the company.
The Brokk Smart Attachments provide a seamless experience with direct communication to the machine.
They integrate real-time data, allowing automatic settings adjustments for optimal performance. This ensures consistent, superior results with any Brokk SmartPower+ robot, Brokk said. The robot will help in smooth and reliable operation every time.
Brokk Group CEO Martin Krupicka said: “We’re excited to introduce the Brokk Smart Attachments, which sets a new standard in demolition.
“These tools are engineered to be more than just equipment, they are an integral part of a smarter, more efficient workflow.
“With Brokk Smart Attachments, operators can focus on the task at hand, while the machine and attachment automatically adjust to maximise performance.”
The Brokk Smart Attachments offer several key features to enhance performance.
Performance optimisation is achieved as the attachments and machines automatically adapt to each other, ensuring optimal results without manual intervention.
Operators can also save their settings for specific attachments, allowing for immediate, optimal performance when switching tools.
Additionally, the attachments are built for enhanced durability, offering reliable and smooth operation, and delivering more performance when paired with Brokk SmartPower+ robots.
According to the demolition robots developer, the attachments are future proof like the new BROKK SMARTPOWER+ machines.
They come with software and data tracking capabilities, allowing operators to monitor hours, tool usage, and performance through MYBROKK, the firm’s comprehensive online portal.
