The project aims to meet the growing demand for electricity in the Seoul metropolitan area.
CRCHI is suppling six TBMs, making it the largest equipment supplier for the project.
The tunnel alignment will traverse high-strength hard rock formations, fault zones and weathered rock areas.
The engineering challenges also include long tunnelling distances, high rock strength, high water pressure, and small turning radius.
