Australia’s New South Wales government says tunnel workers have stronger protections against deadly dust diseases like silicosis since the legally binding Tunnels and Shafts Code of Practice came into force in August.
The new code replaces the Tunnels Under Construction Code of Practice 2006 and aims to bring tunnelling safety into the modern era with a focus on improving ventilation and exposure controls and reflects the technologies and practices now used.
It has been updated to reflect modern tunnel boring methods and contemporary excavation methods as well as modern psychosocial hazards associated with tunnelling, including remote working.
It provides updated risk management guidance for tunnel and shaft construction work, including best practice measures in managing exposure to airborne contaminants such as respirable crystalline silica, ventilation, air monitoring and the use of effective control measures.
The new code aims to help reduce workers’ exposure to hazardous substances including respirable crystalline silica and supports the prevention of related diseases through risk assessment, engineering controls, ventilation, air monitoring and ongoing review of control measures.
It was developed in consultation with tunnelling health and safety experts, industry representatives, unions, and other key stakeholders and outlines health and safety precautions companies must follow.
The code builds on the NSW government’s earlier measures to reduce exposure to respirable crystalline silica. These include establishing the Tunnelling Dust Safety Taskforce to help address silica-related health risks for tunnelling workers; establishing a silica unit within SafeWork NSW; investing A$5m in silicosis research and a patient support programme; A$2.5m for a Lung Bus that provides screening for workers; and establishing the Silica Worker Register to support workers’ ongoing health monitoring.
Since July 1, 2024, SafeWork NSW has conducted more than 4,156 workplace visits related to silica. Inspectors have issued 2,063 improvement notices, 520 prohibition notices and 73 penalty notices relating to respirable crystalline silica across industries.
SafeWork NSW inspectors conducted a statewide tunnel compliance operation from late-September to early-November following the introduction of the Tunnels and Shafts in Construction Code of Practice. They visited three tunnel projects and issued five improvement notices.
Minister for roads and regional transport Jenny Aitchison said the new code set a stronger standard for managing dangerous dust exposure by giving employers clear guidance on how to protect workers.
“Our government’s message to industry is clear. Protecting workers’ health is not optional. We expect businesses to take their responsibilities seriously and make sure every worker gets home safe to their families,” she said.
