Expanding Hydro’s Contribution to Grid Stability
By American Governor Company
With the increased use of variable forms of generation such as wind and solar, there is increased concern not only about load matching, but grid stability itself. Hydropower plants often are proposed to back‐up variable sources due to the ability of hydropower plants to store their fuel/energy.
