The winners of this year’s ITA Tunnelling Awards have been announced.

The recipients were revealed yesterday at a ceremony held alongside the CPT 20th Anniversary Conference in Lisbon.

The winners of the 2026 Tunnelling Awards, celebrating excellence and innovation in the tunnelling and underground space industry, are:

Major Project of the Year – over €500m

Gold: GTX-A Metropolitan Express Railway Deep Tunnel Project between Unjeong–Samsung Station – South Korea

Silver: Beijing East Sixth Ring Road Tunnel – China

Bronze: HS2 MWCC C1 Chiltern Tunnels and Shafts – United Kingdom

Project of the Year – €100–500m

Gold: Relocation of Sha Tin Sewage Treatment Works to Caverns – Main Caverns Construction – Hong Kong, China

Silver: Inter-Terminal Bored Tunnels (ITBT) – Changi Airport – Singapore

Bronze: Monsanto-Santa Apolónia Tunnel – Lisbon Drainage Master Plan – Portugal

Project of the Year – up to €100m

Gold: Ollachea Tunnel – Peru

Silver: Novaliches–Balara Aqueduct 4 (NBAQ4) – Philippines

Bronze: Lisbon Metro Circular Line Extension – Lot 2 (Santos–Cais do Sodré) – Portugal

Rehabilitation, Upgrading and Re-purposing Projects

Gold: Howard Street Tunnel – United States

Silver: The Beverentunnel Renovation – Belgium

Bronze: Total Renovation of the Kennedy Railway Tunnel in Antwerp – Belgium

Technical Innovation of the Year

Gold: Automated Primary Supports for Tunnelling Under Tectonic Stresses and Severe Squeezing – Italy

Silver: A World-First TBM-excavated Spiral Ramp in Hard Granite for Radioactive Waste Disposal – China

Bronze: Complete Equipment and Construction Technology for Vertical Excavation of Ultra-Large-Diameter Prefabricated Shafts – China

Product / Equipment Innovation of the Year

Gold: TBM Integrated Sensing Equipment – China

Silver: Use of Precast Lining and Automated Lining Erector Machine in Mined Tunnels – Australia

Bronze: The Cube System – an Ultra Low Headroom Diaphragm Wall Machine – Belgium

Elevated Thinking: Underground – Shaping the Future

Gold: Elevating Energy Viability: Sustainable LPG Storage in Engineered Rock Caverns – India

Silver: HIPOGEO Santiago Bernabéu Stadium – Spain

Bronze: Planning and Construction of the “#” Shaped Underground Road System in Shanghai CBD Core Area – China

Lifetime Achievement Martin Knights[ https://youtu.be/XOjOGQS6kYA?si=avbIxtiP3RmFbMUb] – United Kingdom

Young Tunneller of the Year

Gold: Gabriel Lehmann – Germany

Silver: Wojciech Mleczko – Poland

Bronze: Xu Chen – China