FOLLOWING THE SUCCESS of the previous No-Dig Live held in September 2014, the 13th biennial trenchless technology exhibition, outdoor demonstrations and seminars will return to Peterborough Arena, 20-22 September 2016.
The recent event featured more than 100 companies, both from home and overseas, presenting an impressive range of products and services for undertaking projects using trenchless technology.
The facilities at the new venue brought the outdoor demonstration area much closer to the indoor exhibits – a feature verbally appreciated by exhibitors and visitors alike. The warm autumn sunshine was a contributing factor to this success, as the huge cargo doors were left fully open during the show, ensuring a free flow of visitor traffic between the two areas. Visitors to the show were offered a wide-ranging programme of educational opportunities.
A visit to the exhibition and demonstration area is an unrivalled forum to see the latest innovations, to see equipment in a live working environment and to discuss how products can enhance the visitor’s business
