Schauenburg Flexadux Ventilation Ducting has been part of the Schauenburg-Group product range for nearly 50 years. Flexadux ducting was designed for use in coal, salt and ore mines as well as for tunnelling and shaft sinking projects. “Highly developed mechanisation of mining and tunnelling today demands high-performance ventilation,” says Schauenburg. “To meet these demands Flexadux has been continuously developed in cooperation with customers and government authorities.”
The Flexadux range includes lay-flat ducting with diameters of up to 3500mm for forced ventilation, as well as spiral-ducting up to 2500mm in diameter.
Schauenburg’s range of ventilation ducting is completed with a wide range of auxiliary equipment.
Schauenburg Tunnel-Ventilation
Tel: +49 208 882 761 0
Email: info@tunnel-ventilation.de
Web: www.tunnel-ventilation.de
Schauenburg Flexadux Ventilation Ducting Schauenburg
