Germany-based construction equipment provider PERI is set to showcase its portfolio of products at bauma 2025, under the motto ‘We are shaping the future together’.
Bauma is a trade show for construction equipment to be held in Munich, Germany, from 7 to 13 April 2025, where PERI and its subsidiaries and partners will exhibit their products.
In its 4,000m2 exhibition hall, the company will showcase exhibits for a wide range of construction projects, including housing projects, tunnels, and bridges, among others.
PERI will showcase the VTC Tunnel Formwork Carriage, and the SB Brace Frame, which use hydraulic units to provide shuttering and striking processes.
They can be moved automatically, which speeds up and simplifies tunnel construction.
Together with its partner KERN Tunneltechnik, PERI will present an expanded tunnel construction portfolio, which includes engineering solutions and customised machines.
MH International, a part of the PERI family that specialises in temporary solutions for infrastructure and renovation projects, will also present its products at bauma.
It will showcase its shoring systems for excavations, supports and spindles for work on existing buildings, temporary access bridges and sensor technology for construction.
PERI, in a statement, said: “Whether it’s a single-family home or a high-rise, a tunnel or a bridge – at bauma 2025, PERI will be showcasing exceptional exhibits for a wide range of construction projects.
“All of them aim to improve safety and efficiency on construction sites worldwide. This year, PERI is focusing in particular on the fields of residential and infrastructure construction.
“Additionally, the company will introduce a variety of digital tools that visitors can try out in Munich. A key focus across the entire portfolio is also the enhancement of sustainability.”
PERI said it is focusing on residential and infrastructure construction this year and will present systems and solutions that improve everyday work on housing projects.
It will present its new-generation MAXIMO Panel Formwork, which features PERIskin coating that requires less energy and offers protection against corrosion.
With SKYFLEX Slab Formwork, PERI will show how its form slabs over large areas and girders mounted from a safe position below can be adapted to the on-site conditions.
In addition, the company will showcase its polymer-based DUO Universal Formwork, along with further development and expansion of its PERI UP Scaffolding Kit.
Also, PERI will showcase the new VCT Composite Track, which enables building steel composite bridges faster and with high-quality concrete carriageway slabs.
Furthermore, the company will exhibit its advanced digital products for construction, which make construction sites more manageable and improve safety.
