Preliminary designs for construction of the 18km first line of the Tel Aviv Metro are under way. The route is designed as a pre-metro light rail line suitable for conversion to heavy metro in the future.

Serving the tunnelling industry since 1969.
Preliminary designs for construction of the 18km first line of the Tel Aviv Metro are under way. The route is designed as a pre-metro light rail line suitable for conversion to heavy metro in the future.