Tunnel Monitoring’s Real Bottleneck Isn’t the Sensor: It’s the Data Silo
A UK case study shows continuous optical monitoring can match an automated total station to within 2mm next to live construction. The bigger opportunity is what happens once that data stops sitting in silos. Epco Berger, Managing Director of TotaLite takes a look.
